Skip to content
DataCentersExposed
Mapped (unverified)

Amazon Web Services

Manassas County, VA

Source: OpenStreetMap

Amazon Web Services is a mapped data center in Manassas County, VA, operated by Amazon Data Services, Inc. and ultimately owned by Amazon.com, Inc.. DataCentersExposed has documented a 124,379 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Amazon.com, Inc.
Operator
Amazon Data Services, Inc.
Est. capacity
~20-50 MW
Footprint
124,379 sq ft
Utility
City of Manassas
Grid
PJM
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

This Amazon Web Services data center in Manassas County, Virginia, is operated by Amazon Data Services, Inc. and owned through its ultimate parent, Amazon.com, Inc. The mapped site has a reported footprint of 124,379 square feet. It draws power from the City of Manassas utility inside the PJM grid.

Operator chain

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Amazon.com, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Total to this operator: $16.7M
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2026 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2026 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2026 · term yr · source
  • Long-Term Rural Enterprise Zone (Morrow County School District 1)$16,668,806
    Morrow County School District 1, OR · granted 2024 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2024 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2021 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2021 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2021 · term yr · source
Statewide cost of this incentive

Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.

source · All Virginia subsidies →

Water use

  • Reported withdrawal90.2K gpd
    2021 · groundwater · matched by location (518 m, low confidence) · source
  • Reported withdrawal12.2K gpd
    2021 · groundwater · matched by location (1,021 m, low confidence) · source
  • Reported withdrawal8.6K gpd
    2021 · groundwater · matched by location (1,033 m, low confidence) · source
  • Reported withdrawal2.7K gpd
    2021 · groundwater · matched by location (1,035 m, low confidence) · source
  • Reported withdrawal9K gpd
    2020 · groundwater · matched by location (1,033 m, low confidence) · source
  • Reported withdrawal3K gpd
    2020 · groundwater · matched by location (1,035 m, low confidence) · source
  • Reported withdrawal97K gpd
    2020 · groundwater · matched by location (518 m, low confidence) · source
  • Reported withdrawal12.6K gpd
    2020 · groundwater · matched by location (1,021 m, low confidence) · source
  • Reported withdrawal15.2K gpd
    2019 · groundwater · matched by location (1,021 m, low confidence) · source
  • Reported withdrawal4.3K gpd
    2019 · groundwater · matched by location (1,035 m, low confidence) · source
  • Reported withdrawal99.1K gpd
    2019 · groundwater · matched by location (518 m, low confidence) · source
  • Reported withdrawal11.8K gpd
    2019 · groundwater · matched by location (1,033 m, low confidence) · source
  • Reported withdrawal13.8K gpd
    2018 · groundwater · matched by location (1,021 m, low confidence) · source
  • Reported withdrawal4.1K gpd
    2018 · groundwater · matched by location (1,035 m, low confidence) · source
  • Reported withdrawal15.2K gpd
    2018 · groundwater · matched by location (1,033 m, low confidence) · source
  • Reported withdrawal97.5K gpd
    2018 · groundwater · matched by location (518 m, low confidence) · source
  • Reported withdrawal3.9K gpd
    2017 · groundwater · matched by location (1,035 m, low confidence) · source
  • Reported withdrawal96.5K gpd
    2017 · groundwater · matched by location (518 m, low confidence) · source
  • Reported withdrawal4.8K gpd
    2017 · groundwater · matched by location (1,033 m, low confidence) · source
  • Reported withdrawal28.1K gpd
    2017 · groundwater · matched by location (1,021 m, low confidence) · source
  • Reported withdrawal4K gpd
    2016 · groundwater · matched by location (1,035 m, low confidence) · source
  • Reported withdrawal97.5K gpd
    2016 · groundwater · matched by location (518 m, low confidence) · source
  • Reported withdrawal30.8K gpd
    2016 · groundwater · matched by location (1,021 m, low confidence) · source
  • Reported withdrawal5K gpd
    2015 · groundwater · matched by location (1,035 m, low confidence) · source
  • Reported withdrawal37.9K gpd
    2015 · groundwater · matched by location (1,021 m, low confidence) · source
  • Reported withdrawal106.1K gpd
    2015 · groundwater · matched by location (518 m, low confidence) · source
  • Reported withdrawal2.9K gpd
    2014 · groundwater · matched by location (1,035 m, low confidence) · source
  • Reported withdrawal35.5K gpd
    2014 · groundwater · matched by location (1,021 m, low confidence) · source
  • Reported withdrawal102.5K gpd
    2014 · groundwater · matched by location (518 m, low confidence) · source
  • Reported withdrawal4.2K gpd
    2013 · groundwater · matched by location (1,035 m, low confidence) · source
  • Reported withdrawal36K gpd
    2013 · groundwater · matched by location (1,021 m, low confidence) · source
  • Reported withdrawal99.2K gpd
    2013 · groundwater · matched by location (518 m, low confidence) · source
  • Reported withdrawal106.3K gpd
    2012 · groundwater · matched by location (518 m, low confidence) · source
  • Reported withdrawal40.2K gpd
    2012 · groundwater · matched by location (1,021 m, low confidence) · source
  • Reported withdrawal3.1K gpd
    2012 · groundwater · matched by location (1,035 m, low confidence) · source
  • Reported withdrawal104.3K gpd
    2011 · groundwater · matched by location (518 m, low confidence) · source
  • Reported withdrawal3K gpd
    2011 · groundwater · matched by location (1,035 m, low confidence) · source
  • Reported withdrawal56.7K gpd
    2011 · groundwater · matched by location (1,021 m, low confidence) · source
  • Reported withdrawal77.9K gpd
    2010 · groundwater · matched by location (1,021 m, low confidence) · source
  • Reported withdrawal98.3K gpd
    2010 · groundwater · matched by location (518 m, low confidence) · source
  • Reported withdrawal2.3K gpd
    2010 · groundwater · matched by location (1,035 m, low confidence) · source

Location-matched records come from state withdrawal reporting, which redacts owner names in the public release. A nearby withdrawal point is circumstantial evidence — the distance and confidence shown are part of the claim.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

What this site costs the grid

source: PJM RPM auction reports
Dominion (Virginia / NC) · 2027/28 auction
$333 /MW-day
Peaked at $444/MW-day in 2025/26 1.65× the rest of PJM

PJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →

This site's capacity-market cost (estimated)
$2.4M to $6.1M/yr

An estimated ~20 to 50 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.

Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →

Air quality near this site

source: AirNow
52
PM2.5
Moderate
36
O3
Good
15
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Northern Virginia), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$152.1K
People of color
53%
Below poverty
3%
Tract population
6,737

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Jennie Dean Elementary in Manassas, is 0.3 mi from this site (589 students). 3 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.