Amazon Web Services
Manassas County, VA
Source: OpenStreetMap
Amazon Web Services is a mapped data center in Manassas County, VA, operated by Amazon Data Services, Inc. and ultimately owned by Amazon.com, Inc.. DataCentersExposed has documented a 124,379 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkThis Amazon Web Services data center in Manassas County, Virginia, is operated by Amazon Data Services, Inc. and owned through its ultimate parent, Amazon.com, Inc. The mapped site has a reported footprint of 124,379 square feet. It draws power from the City of Manassas utility inside the PJM grid.
Operator chain
- Ultimate parentAmazon.com, Inc.
- Files asAmazon Data Services, Inc.
- This facilityAmazon Web Services
In the news
source: Google News- Amazon is investing $10 billion in a new data center campusqz.com· Jun 16, 2026
- Inside Amazon's New US$10bn Missouri Hyperscale Data CentreData Centre Magazine· Jun 16, 2026
- Amazon announces $10 billion Montgomery County data center planKTTN· Jun 16, 2026
- Amazon Unveils Multibillion-Dollar Missouri Data Center InvestmentCrude Oil Prices Today | OilPrice.com· Jun 16, 2026
- What Amazon.com (AMZN)'s US$10 Billion Missouri Data Center Bet Means For Shareholderssimplywall.st· Jun 16, 2026
- Federal court hearing delayed in Amazon data center lawsuitWilmington News Journal· Jun 15, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Amazon.com, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Long-Term Rural Enterprise Zone (Morrow County School District 1)$16,668,806Morrow County School District 1, OR · granted 2024 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2024 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2021 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2021 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2021 · term — yr · source
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
- Reported withdrawal90.2K gpd2021 · groundwater · matched by location (518 m, low confidence) · source
- Reported withdrawal12.2K gpd2021 · groundwater · matched by location (1,021 m, low confidence) · source
- Reported withdrawal8.6K gpd2021 · groundwater · matched by location (1,033 m, low confidence) · source
- Reported withdrawal2.7K gpd2021 · groundwater · matched by location (1,035 m, low confidence) · source
- Reported withdrawal9K gpd2020 · groundwater · matched by location (1,033 m, low confidence) · source
- Reported withdrawal3K gpd2020 · groundwater · matched by location (1,035 m, low confidence) · source
- Reported withdrawal97K gpd2020 · groundwater · matched by location (518 m, low confidence) · source
- Reported withdrawal12.6K gpd2020 · groundwater · matched by location (1,021 m, low confidence) · source
- Reported withdrawal15.2K gpd2019 · groundwater · matched by location (1,021 m, low confidence) · source
- Reported withdrawal4.3K gpd2019 · groundwater · matched by location (1,035 m, low confidence) · source
- Reported withdrawal99.1K gpd2019 · groundwater · matched by location (518 m, low confidence) · source
- Reported withdrawal11.8K gpd2019 · groundwater · matched by location (1,033 m, low confidence) · source
- Reported withdrawal13.8K gpd2018 · groundwater · matched by location (1,021 m, low confidence) · source
- Reported withdrawal4.1K gpd2018 · groundwater · matched by location (1,035 m, low confidence) · source
- Reported withdrawal15.2K gpd2018 · groundwater · matched by location (1,033 m, low confidence) · source
- Reported withdrawal97.5K gpd2018 · groundwater · matched by location (518 m, low confidence) · source
- Reported withdrawal3.9K gpd2017 · groundwater · matched by location (1,035 m, low confidence) · source
- Reported withdrawal96.5K gpd2017 · groundwater · matched by location (518 m, low confidence) · source
- Reported withdrawal4.8K gpd2017 · groundwater · matched by location (1,033 m, low confidence) · source
- Reported withdrawal28.1K gpd2017 · groundwater · matched by location (1,021 m, low confidence) · source
- Reported withdrawal4K gpd2016 · groundwater · matched by location (1,035 m, low confidence) · source
- Reported withdrawal97.5K gpd2016 · groundwater · matched by location (518 m, low confidence) · source
- Reported withdrawal30.8K gpd2016 · groundwater · matched by location (1,021 m, low confidence) · source
- Reported withdrawal5K gpd2015 · groundwater · matched by location (1,035 m, low confidence) · source
- Reported withdrawal37.9K gpd2015 · groundwater · matched by location (1,021 m, low confidence) · source
- Reported withdrawal106.1K gpd2015 · groundwater · matched by location (518 m, low confidence) · source
- Reported withdrawal2.9K gpd2014 · groundwater · matched by location (1,035 m, low confidence) · source
- Reported withdrawal35.5K gpd2014 · groundwater · matched by location (1,021 m, low confidence) · source
- Reported withdrawal102.5K gpd2014 · groundwater · matched by location (518 m, low confidence) · source
- Reported withdrawal4.2K gpd2013 · groundwater · matched by location (1,035 m, low confidence) · source
- Reported withdrawal36K gpd2013 · groundwater · matched by location (1,021 m, low confidence) · source
- Reported withdrawal99.2K gpd2013 · groundwater · matched by location (518 m, low confidence) · source
- Reported withdrawal106.3K gpd2012 · groundwater · matched by location (518 m, low confidence) · source
- Reported withdrawal40.2K gpd2012 · groundwater · matched by location (1,021 m, low confidence) · source
- Reported withdrawal3.1K gpd2012 · groundwater · matched by location (1,035 m, low confidence) · source
- Reported withdrawal104.3K gpd2011 · groundwater · matched by location (518 m, low confidence) · source
- Reported withdrawal3K gpd2011 · groundwater · matched by location (1,035 m, low confidence) · source
- Reported withdrawal56.7K gpd2011 · groundwater · matched by location (1,021 m, low confidence) · source
- Reported withdrawal77.9K gpd2010 · groundwater · matched by location (1,021 m, low confidence) · source
- Reported withdrawal98.3K gpd2010 · groundwater · matched by location (518 m, low confidence) · source
- Reported withdrawal2.3K gpd2010 · groundwater · matched by location (1,035 m, low confidence) · source
Location-matched records come from state withdrawal reporting, which redacts owner names in the public release. A nearby withdrawal point is circumstantial evidence — the distance and confidence shown are part of the claim.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~20 to 50 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Northern Virginia), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Jennie Dean Elementary in Manassas, is 0.3 mi from this site (589 students). 3 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.