Amazon is a mapped data center in Bexar County, TX, operated by Amazon.com, Inc.. DataCentersExposed has documented a 104,910 sq ft footprint at this site.

Reporting by · Updated Jun 18, 2026

Real parent
Amazon.com, Inc.
Operator
Amazon.com, Inc.
Est. capacity
~20-45 MW
Footprint
104,910 sq ft
Interconnection
~17 MW
Attribution & capacity confidence:mediumprimary source

Overview

source: link

data center

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
619 ft
Amd · 138 kV
Transmission line
584 ft
138 kV line
Municipal water
Served
San Antonio Water System

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Amazon.com, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Dollar value not disclosed for these records.
  • Texas Qualifying Large Data Center Project ExemptionTax break$0
    State of Texas · granted 2026 · term yr · source
  • Texas Qualifying Large Data Center Project ExemptionTax break$0
    State of Texas · granted 2026 · term yr · source
  • Texas Qualifying Large Data Center Project ExemptionTax break$0
    State of Texas · granted 2026 · term yr · source
Statewide cost of this incentive

Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.

source · All Texas subsidies →

Water use

Modeled estimate~319.3K gpd
Direct (onsite cooling)
~172.5K gpd
Indirect (its electricity)
~146.9K gpd

No measured record exists, so this is a low-confidence model from 17 MW (interconnection capacity): 2 L/kWh cooling (hot climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
54
PM2.5
Moderate
21
O3
Good
18
PM10
Good

Air Quality Index from the nearest AirNow reporting area (San Antonio), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$46.8K
People of color
70%
Below poverty
8%
Tract population
2,849

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Great Hearts Western Hills in San Antonio, is 1.0 mi from this site (1,056 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.