Amazon IAD100

Prince William County, VA

Source: OpenStreetMap

Amazon IAD100 is an operating data center in Prince William County, VA, operated by Amazon Data Services, Inc. and ultimately owned by Amazon.com, Inc.. DataCentersExposed has documented 48 MW of reported power capacity and a 214,611 sq ft footprint at this site.

Reporting by · Updated Jun 18, 2026

Real parent
Amazon.com, Inc.
Operator
Amazon Data Services, Inc.
Power
48 MW
Footprint
214,611 sq ft
Utility
Virginia Electric & Power Co
Grid
PJM
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Amazon Web Services data center

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
711 ft
Unknown175880 · 230 kV
Transmission line
493 ft
230 kV line
Municipal water
Served
Pwcsa - West

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.

source · All Virginia subsidies →

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Environmental permits

source: Permit register
  • VA DEQ air permit (minor NSR)74129
    Diesel backup-generator air permit. Program: mNSR. Reg. 74129.

What this site costs the grid

source: PJM RPM auction reports
Dominion (Virginia / NC) · 2027/28 auction
$333 /MW-day
Peaked at $444/MW-day in 2025/26 1.65× the rest of PJM

PJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →

This site's capacity-market cost
$5.8M/yr

48 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.

Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →

Nearest school

source: HIFLD / NCES

The nearest public school, George Carr Round Elementary in Manassas, is 0.5 mi from this site (495 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.