Amazon IAD100 is an operating data center in Prince William County, VA, operated by Amazon Data Services, Inc. and ultimately owned by Amazon.com, Inc.. DataCentersExposed has documented 48 MW of reported power capacity and a 214,611 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkAmazon Web Services data center
Operator chain
- Ultimate parentAmazon.com, Inc.
- Files asAmazon Data Services, Inc.
- This facilityAmazon IAD100
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Pennsylvania records reveal Amazon behind contested Project Hazelnut data centerThe Cool Down· Aug 29, 2026
- Amazon replies to Kline residents about data centerThe Standard-Speaker· Aug 28, 2026
- Chesapeake wants to hear from you on data center rulesThe Virginian-Pilot· Aug 28, 2026
- Amazon Locks In 200MW of Swedish Wind Power to Fuel Data Center Expansionfinance.biggo.com· Aug 28, 2026
- State, local data center tax breaks total billions for trillion-dollar tech companiesDayton Daily News· Aug 28, 2026
- Ohio politicians welcomed unregulated data centers by the hundreds. Ohio citizens are fighting back.Ohio Capital Journal· Aug 28, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Environmental permits
source: Permit register- VA DEQ air permit (minor NSR)74129Diesel backup-generator air permit. Program: mNSR. Reg. 74129.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
48 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Nearest school
source: HIFLD / NCESThe nearest public school, George Carr Round Elementary in Manassas, is 0.5 mi from this site (495 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline