Amazon Clinton Data Center
Clinton, Hinds County, MS
Source: Primary source
Amazon Clinton Data Center is a under construction data center in Hinds County, MS, operated by Amazon.com, Inc..
Reporting by Eric Keller · Updated Jun 13, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkAmazon data center under construction in Clinton, Mississippi, with 1,500 workers on site. Announced investment: $1.0B. Discovered from news coverage and promoted after review; details to be enriched from primary sources.
Operator chain
- Ultimate parentAmazon.com, Inc.
- Files asAmazon.com, Inc.
- This facilityAmazon Clinton Data Center
In the news
source: GDELT- ‘Exciting day in Mississippi’: Ribbon-cutting marks opening of Clinton data center - WLBTWLBT· Jun 10, 2026
- Ribbon-cutting ceremony held for new Amazon data center in Clinton - SuperTalk Mississippi MediaSuperTalk Mississippi Media· Jun 10, 2026
- 1,500 workers are building Amazon’s Clinton data center - WAPTWAPT· Jun 10, 2026
- ‘When Amazon comes to town.’ Clinton and company host ribbon cutting for new data center - DeSoto County NewsDeSoto County News· Jun 9, 2026
- ‘When Amazon comes to town.’ Clinton and company host ribbon cutting for new data center - Mississippi TodayMississippi Today· Jun 9, 2026
- ‘Exciting day in Mississippi’: Ribbon-cutting marks opening of Clinton data center - WLBTWLBT· Jun 9, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Amazon.com, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Long-Term Rural Enterprise Zone (Morrow County School District 1)$16,668,806Morrow County School District 1, OR · granted 2024 · term — yr · source
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Clinton Voc Complex in Clinton, is 0.6 mi from this site. 2 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.