Mapped (unverified)colocation
aCure
Perth, Western Australia, Australia
Source: Primary source
aCure is a mapped data center in Western Australia, Australia, operated by Vocus. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Oct 11, 2026
Real parent
Vocus
Operator
Vocus
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
Western Australia
Overview
source: linkVocus Group — colocation facility (1 networks present). Source: PeeringDB.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%
National grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)- Vocus plans 4,000km Brisbane-Darwin ducted fibre route as second ADIP projectcapacityglobal.com· Sep 24, 2026
- ASC cable break causes connectivity disruption between Perth and SingaporeData Center Dynamics· Sep 7, 2026
- Vocus-occupied data center outside Perth, Australia, soldData Center Dynamics· Jul 13, 2026
- Perth data centre, office trades for $13.1mrealestatesource· Jul 13, 2026
- Vocus invests $344M in Sydney-Melbourne ducted fiber cableLight Reading· Jul 1, 2026
- Vocus to build Australia’s first ducted long-haul fibre route between Sydney and MelbourneCapacity Media· Jun 30, 2026