Nextdc Ph1 is a mapped data center in Western Australia, Australia, operated by NEXTDC. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
NEXTDC
Operator
NEXTDC
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
Western Australia
Overview
source: linkNEXTDC — colocation facility (1 networks present). Source: PeeringDB.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%
National grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)- NextDC breaks ground on 4.4MW Edge data center in Geelong, AustraliaData Center Dynamics· Apr 22, 2026
- Aussie data center firm NextDC secures 250MW data center deals, set to raise more than AU$1.5 billion via new sharesData Center Dynamics· Apr 20, 2026
- Australia's NextDC breaks ground on Sydney data centerData Center Dynamics· Mar 30, 2026
- Australia's NextDC tops out 6MW data center in DarwinData Center Dynamics· Mar 9, 2026
- NextDC seeks partner for 850MW data center JV in Sydney, AustraliaData Center Dynamics· Sep 2, 2025
- NEXTDC: AU$1.3bn Boost for Data Centres in Australia & APACData Centre Magazine· Aug 18, 2025
See something wrong or missing on this page? Suggest a correction.