Skip to content
DataCentersExposed
ultimate parent

IREN Limited

DataCentersExposed tracks 2 data centers operated by IREN Limited across 1 state, of which 1 is proposed or under construction, with 2.8 GW of reported power capacity.

Reporting by

Facilities
2
tracked
States
1
footprint
Pipeline
1
proposed / building
Reported power
2.8 GW
2 facilities

Where IREN Limited builds

FacilityLocationStatusMW
Sweetwater 1 and 2Sweetwater, TXProposed2,000
Childress Data CenterChildress, TXOperating750

Methodology & sources

Corporate parent chains and project codenames are resolved from SEC filings, state incorporation records, and permit documents. Each link carries a confidence level; low-confidence inferences are labeled.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.