ultimate parent
IREN Limited
DataCentersExposed tracks 2 data centers operated by IREN Limited across 1 state, of which 1 is proposed or under construction, with 2.8 GW of reported power capacity.
Reporting by Eric Keller
Facilities
2
tracked
States
1
footprint
Pipeline
1
proposed / building
Reported power
2.8 GW
2 facilities
Where IREN Limited builds
| Facility | Location | Status | MW |
|---|---|---|---|
| Sweetwater 1 and 2 | Sweetwater, TX | Proposed | 2,000 |
| Childress Data Center | Childress, TX | 750 |