Skip to content
DataCentersExposed
County data-center profile

Kings County, New York

DataCentersExposed tracks 1 AI data center in Kings County, New York — 1 operating and 0 in the pipeline, drawing 10 MW of reported power demand. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Facilities
1
Operating
1
Pipeline
0

Reporting by · Updated May 29, 2026

Risk breakdown
4Low
  • Project exposure · 7
  • Power demand · 0
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Kings County

Facilities here with disclosed capacity draw 10 MW from the local grid. Data-center load on this scale is the single biggest driver of recent capacity-market price increases — costs that flow through to every ratepayer in the service territory, not just the operators.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

1 facilities

Every tracked facility

FacilityOperatorStatusMW
Dataverge
Brooklyn
Operating10
Accountability

County commissioners

How the Kings County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.