Skip to content
DataCentersExposed
County data-center profile

Erie County, New York

DataCentersExposed tracks 3 AI data centers in Erie County, New York — 0 operating and 0 in the pipeline, drawing 600 MW of reported power demand. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Facilities
3
Operating
0
Pipeline
0

Reporting by · Updated May 29, 2026

Risk breakdown
4Low
  • Project exposure · 7
  • Power demand · 0
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Erie County

Facilities here with disclosed capacity draw 600 MW from the local grid. Data-center load on this scale is the single biggest driver of recent capacity-market price increases — costs that flow through to every ratepayer in the service territory, not just the operators.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

3 facilities

Every tracked facility

FacilityOperatorStatusMW
Riverview Innovation & Technology Campus
Tonawanda
Blocked600
Frontier Science
Amherst
Mapped (unverified)
Tesla Dojo Supercomputer
Buffalo
Withdrawn
Accountability

County commissioners

How the Erie County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.