Skip to content
DataCentersExposed
County data-center profile

Middlesex County, New Jersey

DataCentersExposed tracks 10 AI data centers in Middlesex County, New Jersey — 3 operating and 0 in the pipeline, drawing 81 MW of reported power demand, led by Digital Realty Trust, Inc.. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Facilities
10
Operating
3
Pipeline
0

Reporting by · Updated May 29, 2026

Risk breakdown
14Low
  • Project exposure · 24
  • Power demand · 0
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Middlesex County

Facilities here with disclosed capacity draw 81 MW from the local grid. Data-center load on this scale is the single biggest driver of recent capacity-market price increases — costs that flow through to every ratepayer in the service territory, not just the operators.

Digital Realty Trust, Inc. has the largest presence in Middlesex County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

Modeled scenario · not announced

2035 Buildout Outlook

via PNNL IM3 (CC BY 4.0)

Under the model's moderate-growth scenario (5%/yr annual load growth), PNNL's IM3 model sites about 6 standardized 36 MW campuses in Middlesex County by 2035 — roughly 216 MW of new electricity demand and ~209 M gal/yr of cooling water. Under the higher-growth scenario (15%/yr) that climbs to 9 campuses (324 MW). For scale, we currently track 10 real data centers in Middlesex County (81 MW of reported power).

Modeled new campuses by demand-growth scenario
  • Low growth5
    180 MW · ~174 M gal/yr cooling water
  • Moderate growth6
    216 MW · ~209 M gal/yr cooling water
  • High growth8
    288 MW · ~279 M gal/yr cooling water
  • Higher growth9
    324 MW · ~313 M gal/yr cooling water

The model assigns ~100% of these campuses' cooling to evaporative water cooling in Middlesex County (the rest to mechanical/air cooling), a split it derives from local water stress and wet-bulb temperature.

These are modeled candidate sites, not announced or permitted facilities. PNNL's IM3 model places identical 36 MW unit-campuses at feasible locations under each scenario — it shows where demand could concentrate, never a specific parcel. Figures use a market-gravity weight of 50. How the model works.

10 facilities

Every tracked facility

FacilityOperatorStatusMW
QTS Piscataway Data Center
Piscataway
QTS Realty Trust, LLCOperating52
Digital Realty New York EWR11
Piscataway Township
Digital Realty Trust, Inc.Operating26
DataBank Piscataway EWR2DataBank Holdings, Ltd.Operating3
Barclays DatacenterMapped (unverified)
EquinixEquinix, Inc.Mapped (unverified)
IO Datacenter
Edison
Compass Datacenters, LLCMapped (unverified)
New Brunswick Data Center
New Brunswick
Withdrawn
Open Data Centers PiscatawayPrime Data CentersMapped (unverified)
OptimumMapped (unverified)
Verizon Wireline Network BuildingVerizon Communications Inc.Mapped (unverified)
Accountability

County commissioners

How the Middlesex County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.