Sacramento County, California

DataCentersExposed tracks 5 AI data centers in Sacramento County, California — 4 operating and 1 in the pipeline, drawing 20 MW of reported power demand, led by NTT Global Data Centers. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Facilities
5
Operating
4
Pipeline
1

Reporting by · Updated May 29, 2026

Risk breakdown
9Low
  • Project exposure · 16
  • Power demand · 0
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Sacramento County

Facilities here with disclosed capacity draw 20 MW from the local grid. Data-center load on this scale is the single biggest driver of recent capacity-market price increases — costs that flow through to every ratepayer in the service territory, not just the operators.

NTT Global Data Centers has the largest presence in Sacramento County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

Modeled scenario · not announced

2035 Buildout Outlook

via PNNL IM3 (CC BY 4.0)

Under the model's moderate-growth scenario (5%/yr annual load growth), PNNL's IM3 model sites about 15 standardized 36 MW campuses in Sacramento County by 2035 — roughly 540 MW of new electricity demand and ~522 M gal/yr of cooling water. Under the higher-growth scenario (15%/yr) that climbs to 67 campuses (2.4 GW). For scale, we currently track 5 real data centers in Sacramento County (20 MW of reported power).

Modeled new campuses by demand-growth scenario
  • Low growth10
    360 MW · ~348 M gal/yr cooling water
  • Moderate growth15
    540 MW · ~522 M gal/yr cooling water
  • High growth42
    1.5 GW · ~1.5 billion gal/yr cooling water
  • Higher growth67
    2.4 GW · ~2.3 billion gal/yr cooling water

The model assigns ~100% of these campuses' cooling to evaporative water cooling in Sacramento County (the rest to mechanical/air cooling), a split it derives from local water stress and wet-bulb temperature.

These are modeled candidate sites, not announced or permitted facilities. PNNL's IM3 model places identical 36 MW unit-campuses at feasible locations under each scenario — it shows where demand could concentrate, never a specific parcel. Figures use a market-gravity weight of 50. How the model works.

5 facilities

Every tracked facility

FacilityOperatorStatusMW
Prime Data Centers Sacramento SMF02
Sacramento
Prime Data CentersUnder construction18
Edgeconnex Data Center
Rancho Cordova
EdgeConneX, Inc.Operating2
QTS Sacramento
Sacramento
QTS Realty Trust, LLCOperating
RagingWire CA2
Sacramento
NTT Global Data CentersOperating
RagingWire CA3
Sacramento
NTT Global Data CentersOperating
Accountability

County commissioners

How the Sacramento County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.