DataCentersExposed tracks 26 AI data centers in Kansas — 6 operating and 7 in the pipeline — across 8 counties, drawing 715 MW of reported power demand from 3 tracked corporate operators.

Sources: Methodology, Coverage scorecard

Reporting by · Updated May 29, 2026

Tracked
26
data centers
Operating
6
live today
Pipeline
7
proposed / building
Demand
715 MW
4 w/ capacity
Counties
8
touched
Operators
3
corporate parents
The story so far

Kansas at a glance

The largest footprint in Kansas belongs to Digital Realty Trust, Inc., behind 2 tracked facilities. Prime Data Centers and TierPoint, LLC round out the most active operators in the state. Many of these sites are filed under shell or project names rather than the parent's — our operator column resolves them back to the real corporate parent wherever the chain is documented.

Geographically, the buildout clusters: Johnson County leads Kansas with 9 facilities and a composite risk score of 9/100. Crawford County and Ellis County follow. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.

Kansas is not done growing. 7 facilities are in the pipeline — proposed, permitted, or under construction — which is where residents still have a say at zoning hearings and in rate cases. Each pending project is a decision about land, water, electricity prices, and tax revenue that hasn't been finalized.

We also surface the accountability trail: 4 state bills mentioning data centers and 6 recent news items are tracked for Kansas below, pulled from LegiScan and GDELT and refreshed automatically. Legislation is linked to the counties and operators it names; news is classified by community sentiment.

Who's building

Top operators in Kansas

Where it's concentrated

County risk leaderboard

Risk methodology
Still contested

Pipeline & proposals

26 of 26 shown

All tracked facilities

FacilityOperatorStatusCountyMW
Red Wolf PropertiesProposedWyandotte600
Alcove Development Data CenterProposedMiami50
Astra Enterprise ParkDigital Realty Trust, Inc.Proposed
KCK Data CenterProposedWyandotte
Kansas City, KS (SEC-disclosed)Digital Realty Trust, Inc.Proposed
Mount Sunflower Properties LLC Data CenterProposedJohnson
Project PilotBeale InfrastructureUnder constructionJohnson
LFF IndustrialBlockedOgle48
Cloud Storage CorpMapped (unverified)Ellis
Colossus Data CenterWithdrawnJohnson
Digital De SotoOperatingJohnson
Data Center LenexaPrime Data CentersMapped (unverified)Johnson
DataBank Kansas City (MCI2)Mapped (unverified)
DataBank Kansas City (MCI3)Mapped (unverified)
Edgerton ProjectOperatingJohnson
Edgerton Data CenterBlockedJohnson
LightEdge Kansas City Cavern (KCI2)Mapped (unverified)
Netrality Kansas City Metro – KC2 | 7801 NiemanMapped (unverified)
PilotOperatingJOHNSON
QTS Overland Park (OVP1)Mapped (unverified)
ScMapped (unverified)Barber
Sfp 241 242 LLCOperatingFORD
State Farm Data CenterPrime Data CentersMapped (unverified)Johnson
TierPointTierPoint, LLCOperatingJohnson
U.S. Bank National Data Process CenterMapped (unverified)Johnson
WildcatOperatingCRAWFORD

Methodology & sources

Facility counts include operating, under-construction, proposed, and permitted sites. Capacity (MW) combines operator disclosures, interconnection-queue estimates, and research datasets; see each facility for provenance. County risk scores weight project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%), renormalized over measured factors.