DataCentersExposed tracks 26 AI data centers in Kansas — 6 operating and 7 in the pipeline — across 8 counties, drawing 715 MW of reported power demand from 3 tracked corporate operators.

Sources: Methodology, Coverage scorecard

Reporting by · Updated May 29, 2026

Tracked
26
data centers
Operating
6
live today
Pipeline
7
proposed / building
Demand
715 MW
4 w/ capacity
Counties
8
touched
Operators
3
corporate parents
The story so far

Kansas at a glance

The largest footprint in Kansas belongs to Digital Realty Trust, Inc., behind 2 tracked facilities. Prime Data Centers and TierPoint, LLC round out the most active operators in the state. Many of these sites are filed under shell or project names rather than the parent's — our operator column resolves them back to the real corporate parent wherever the chain is documented.

Geographically, the buildout clusters: Johnson County leads Kansas with 9 facilities and a composite risk score of 9/100. Ford County and Crawford County follow. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.

Kansas is not done growing. 7 facilities are in the pipeline — proposed, permitted, or under construction — which is where residents still have a say at zoning hearings and in rate cases. Each pending project is a decision about land, water, electricity prices, and tax revenue that hasn't been finalized.

We also surface the accountability trail: 4 state bills mentioning data centers and 6 recent news items are tracked for Kansas below, pulled from LegiScan and GDELT and refreshed automatically. Legislation is linked to the counties and operators it names; news is classified by community sentiment.

Who's building

Top operators in Kansas

Where it's concentrated

County risk leaderboard

Risk methodology
Still contested

Pipeline & proposals

26 of 26 shown

All tracked facilities

FacilityOperatorStatusCountyMW
Red Wolf Properties—ProposedWyandotte600
Alcove Development Data Center—ProposedMiami50
Astra Enterprise ParkDigital Realty Trust, Inc.Proposed——
KCK Data Center—ProposedWyandotte—
Kansas City, KS (SEC-disclosed)Digital Realty Trust, Inc.Proposed——
Mount Sunflower Properties LLC Data Center—ProposedJohnson—
Project PilotBeale InfrastructureUnder constructionJohnson—
LFF Industrial—BlockedOgle48
Cloud Storage Corp—Mapped (unverified)Ellis—
Colossus Data Center—WithdrawnJohnson—
Digital De Soto—OperatingJohnson—
Data Center LenexaPrime Data CentersMapped (unverified)Johnson—
DataBank Kansas City (MCI2)—Mapped (unverified)——
DataBank Kansas City (MCI3)—Mapped (unverified)——
Edgerton Project—OperatingJohnson—
Edgerton Data Center—BlockedJohnson—
LightEdge Kansas City Cavern (KCI2)—Mapped (unverified)——
Netrality Kansas City Metro – KC2 | 7801 Nieman—Mapped (unverified)——
Pilot—OperatingJOHNSON—
QTS Overland Park (OVP1)—Mapped (unverified)——
Sc—Mapped (unverified)Barber—
Sfp 241 242 LLC—OperatingFORD—
State Farm Data CenterPrime Data CentersMapped (unverified)Johnson—
TierPointTierPoint, LLCOperatingJohnson—
U.S. Bank National Data Process Center—Mapped (unverified)Johnson—
Wildcat—OperatingCRAWFORD—

Methodology & sources

Facility counts include operating, under-construction, proposed, and permitted sites. Capacity (MW) combines operator disclosures, interconnection-queue estimates, and research datasets; see each facility for provenance. County risk scores weight project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%), renormalized over measured factors.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.