Norway · county
Trøndelag
DataCentersExposed tracks 3 AI data centers in Trøndelag, Norway — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 1 tracked operator.
Sources: Norway, Methodology
Tracked
3
Operating
0
In pipeline
0
Reported power
0 MW
Facilities
Tracked data centers
- GlobalConnect TrondheimGlobalConnectMapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
In the local press
Trøndelag data-center coverage
- Nå må du våkne, Tungadressa.no· Aug 13, 2026
- Deler ut kraft verdt millioner til AI-forskningE24· Aug 12, 2026
- Vil ha strengere datasenter-kravKlassekampen· Aug 11, 2026
- Anthropic flytter trolig inn i Tydalkode24· Aug 5, 2026
- Gigantisk kontrakt for AI-datasenter i TrøndelagE24· Aug 4, 2026
- Sikret milliardkontrakt – skal bygge gigadatasenterNRK· Aug 4, 2026
Live headlines via Google News — in English and Norway's local press.