Mexico · state
Jalisco
DataCentersExposed tracks 1 AI data center in Jalisco, Mexico — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 0 tracked operators.
Sources: Mexico, Methodology
Tracked
1
Operating
0
In pipeline
0
Reported power
0 MW
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Facilities
Tracked data centers
- Mapped (unverified)
In the local press
Jalisco data-center coverage
- Flex invertirá 1,000 mdd en desarrollo de Centros de Datos de IA en Guadalajara, Aguascalientes y Ciudad JuárezDPL News· Apr 17, 2026
- Flex invertirá 1,000 millones de dólares en Jalisco para proyecto de IA y data centersEl Economista· Apr 16, 2026
- Flex anuncia con Sheinbaum que invertirá 1,000 millones de dólares en México para centro de datos e IAForbes México· Apr 16, 2026
- Flex invertirá mil millones de dólares en México para fabricación de equipo de centro de datos e IALa Silla Rota· Apr 16, 2026
- Guadalajara tendrá en 2028 un gran centro de datos con una inversión de hasta mil millonesDemócrata· Feb 25, 2026
- Jalisco va por más centros de datos; buscan detonar economíaReporte Indigo· Jan 12, 2026
Live headlines via Google News — in English and Mexico's local press.