Indonesia · province
Jawa Tengah
DataCentersExposed tracks 8 AI data centers in Jawa Tengah, Indonesia — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 1 tracked operator.
Sources: Indonesia, Methodology
Tracked
8
Operating
0
In pipeline
0
Reported power
0 MW
Facilities
Tracked data centers
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Nodeast Cloud (srv03.dyaksanala)PT Era Daya CiptaMapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
In the local press
Jawa Tengah data-center coverage
- PLN UID Jateng Pasok 1.000 MVA untuk Data di BatangListrik Indonesia· Aug 27, 2026
- PLN UID Jateng siapkan pasokan 1.000 MVA untuk Data Center Nextier di BatangANTARA News Jateng· Aug 26, 2026
- Nvidia Naikkan Harga Server AI hingga 15 Persen, Biaya Pusat Data Makin MahalAkurat Jateng· Aug 26, 2026
- Sambut Hari Pelanggan Nasional, PLN UID Jateng Siapkan Pasokan 1.000 MVA untuk Data Center Nextier di BatangRadar Semarang· Aug 26, 2026
- Pasar Industri Greater Jakarta Tetap Resilien, Data Center Penopang UtamaProperty & Bank· Aug 22, 2026
- Data Center Dominasi Serapan Lahan Industri, Cilegon Berpotensi Jadi Klaster EVSWA.co.id· Aug 20, 2026
Live headlines via Google News — in English and Indonesia's local press.