United Kingdom · region
Norfolk
DataCentersExposed tracks 1 AI data center in Norfolk, United Kingdom — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 1 tracked operator.
Sources: United Kingdom, Methodology
Tracked
1
Operating
0
In pipeline
0
Reported power
0 MW
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Facilities
Tracked data centers
- Winterton Cable Landing StationVodafoneMapped (unverified)
In the local press
Norfolk data-center coverage
- OpenAI to expand UK workforce with new London siteEDP24· Apr 13, 2026
- Largest UK AI data centre campus granted planning permissionPlanning, Building & Construction Today· Mar 12, 2026
- ‘Data centre surge would put UK’s climate targets at risk, plus borough bids to set up station development body’Planning Resource· Feb 23, 2026
- Global Switch secures clean power for UK data centre in deal with RWE | Onshore Wind NewsRenewables Now· Jan 22, 2026
- Greenfield site development will lead to changes in data centre design in 2026verdict.co.uk· Jan 13, 2026
- Inside the data center built to withstand a nuclear blastBeBeez International· Dec 12, 2025
Live headlines via Google News — in English and United Kingdom's local press.