United Kingdom · region
Kent
DataCentersExposed tracks 6 AI data centers in Kent, United Kingdom — 1 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 2 tracked operators.
Sources: United Kingdom, Methodology
Tracked
6
Operating
1
In pipeline
0
Reported power
0 MW
Facilities
Tracked data centers
- CXD Infrastructure SolutionsDXC UKIMapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- The Bunker - South East Data CentreThe Bunker Secure Hosting Ltd
- Mapped (unverified)
In the local press
Kent data-center coverage
- 'Hardworking' Kent nurse among 33 missing Brits in Nepal as flash floods cause 'irreplaceable loss'Kent Live· Aug 28, 2026
- ‘We don’t like this AI data centre and we don’t want it - it is totally unacceptable’Kent Online· Aug 18, 2026
- Hundreds slam ‘monstrous’ plans to build AI-supporting data centre on green beltKent Online· Jul 23, 2026
- Full impact assessment needed for huge Orpington data centre on Green BeltNews Shopper· Jul 23, 2026
- Methane-powered AI: How to beat the UK's data-centre crunchthenationalnews.com· Jul 16, 2026
- The tiny village about to be dwarfed by a £3billion data centre on 145 acres of farmlandDaily Mail· Jul 15, 2026
Live headlines via Google News — in English and United Kingdom's local press.