United Kingdom · region
Hertfordshire
DataCentersExposed tracks 13 AI data centers in Hertfordshire, United Kingdom — 1 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 5 tracked operators.
Sources: United Kingdom, Methodology
Tracked
13
Operating
1
In pipeline
0
Reported power
0 MW
Facilities
Tracked data centers
- Mapped (unverified)
- Colt London North Data CentreColt Data Centre Services
- Mapped (unverified)
- Google Datacentre Waltham CrossAlphabet Inc.Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Starwood HouseTescoMapped (unverified)
- The Chess BuildingCapitaLand Ascendas REITMapped (unverified)
- nLighten London STN1nLightenMapped (unverified)
In the local press
Hertfordshire data-center coverage
- Civo plans 8MW Edge data center for AI in Hertfordshire, UKData Center Dynamics· Oct 1, 2026
- Data centres are spreading across the UK – and the pressure on our natural spaces is mountingCountryfile.com· Sep 29, 2026
- Equinix Hertfordshire Data Center Gains £3.9bn Investment as UK Data Centre Race IntensifiesConstruction Review· Sep 1, 2026
- Life in Britain's data centre capital: Constant humming, a straining energy grid and temperatures '2C higher' thanks to 30 sites over one square mileDaily Mail· Jul 25, 2026
- Why are thousands of people opposing a new data centre?BBC· Jul 9, 2026
- The Global AI Buildout Needs Energy Transition GuardrailsNRDC· May 26, 2026
Live headlines via Google News — in English and United Kingdom's local press.