France · région
Provence-Alpes-Côte d'Azur
DataCentersExposed tracks 30 AI data centers in Provence-Alpes-Côte d'Azur, France — 7 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 18 tracked operators.
Sources: France, Methodology
Tracked
30
Operating
7
In pipeline
0
Reported power
0 MW
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Facilities
Tracked data centers
- B4Air FranceMapped (unverified)
- Cogent AntibesCogent CommunicationsMapped (unverified)
- Cogent NiceCogent CommunicationsMapped (unverified)
- Datacenter SudAix-Marseille UniversitéMapped (unverified)
- Digital Realty MRS1Digital Realty Trust, Inc.
- Digital Realty MRS2Digital Realty Trust, Inc.Mapped (unverified)
- Digital Realty MRS3Digital Realty Trust, Inc.Mapped (unverified)
- Digital Realty MRS4Digital Realty Trust, Inc.Mapped (unverified)
- Mapped (unverified)
- Euclyde DC1EuclydeMapped (unverified)
- Euclyde DC3EuclydeMapped (unverified)
- FdjFDJMapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Interoute MarseilleInteroute
- Marseille NedelecOrangeMapped (unverified)
- Marseille St-MaurontOrangeMapped (unverified)
- Phocea DCPhocea DC
- TAS GroupTAS GroupMapped (unverified)
- Mapped (unverified)
- Telehouse THM1KDDIMapped (unverified)
- Verizon MarseilleVerizon Communications Inc.Mapped (unverified)
- XL 360 - Data CenterXL 360Mapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- nLighten Sophia Antipolis NCE1nLightenMapped (unverified)
In the local press
Provence-Alpes-Côte d'Azur data-center coverage
- Un centre de données écoresponsable s'installe à BriançonBFM· May 13, 2026
- Inquiétudes autour d'un projet de data center de grande taille dans la future cité du cinéma de la villeFrance 3 Régions· Apr 24, 2026
- Mines de lithium, data centers… la liste des « projets stratégiques » annoncés par Emmanuel Macron pour « réindustrialiser la France »Le Parisien· Apr 23, 2026
- "Vous êtes déjà fortement pollués, donc un peu plus un peu moins..." : un projet de data center déclenche la résistance d'élus et de riverainsFrance 3 Régions· Apr 19, 2026
- Emploi IT : après deux années de croissance, le marché ralentit nettement en 2025Siècle Digital· Feb 17, 2026
- Bouc-Bel-Air dit finalement oui au projet de data center dans la ZAC des Chabaudsici.fr· Nov 17, 2025
Live headlines via Google News — in English and France's local press.