Mapped (unverified)colocation
Hexatom Sophia Antipolis
Nice, Provence-Alpes-Côte d'Azur, France
Source: Primary source
Hexatom Sophia Antipolis is a mapped data center in Provence-Alpes-Côte d'Azur, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Provence-Alpes-Côte d'Azur
Overview
source: linkHexatom S.A.R.L. — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- VIDÉO. Data center, Paris-Nice et repas à un euro : ce qu'il faut retenir cette semaine dans l'Indrelanouvellerepublique.fr· Sep 25, 2026
- Un projet qui inquiète les habitants de Dardilly, l'installation d'un data center dédié à l'IABFM· Sep 24, 2026
- Le projet du data center de Microsoft près de Mulhouse reçoit un avis favorable, il doit occuper environ 35 hectaresBFM· Aug 24, 2026
- "Une action coup de poing": À Mulhouse, une manifestation contre un projet de data-center construit par MicrosoftBFM· Jun 22, 2026
- "Montrer que Fumel est une ville du XXIe siècle" : un data center géant pourrait voir le jour sur une friche industrielle de 4 hectaresPetitBleu.fr· Jun 3, 2026
- Data center, logiciels et formation à l'IA : encore des annonces tech XXL à Choose FranceLa Tribune· Jun 1, 2026
See something wrong or missing on this page? Suggest a correction.