Mapped (unverified)colocation
XS4ALL Oude Meer
Schiphol Rijk, Noord-Holland, Netherlands
Source: Primary source
XS4ALL Oude Meer is a mapped data center in Noord-Holland, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Noord-Holland
Overview
source: linkXS4ALL Internet B.V. — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Mega-datacenters vlak bij Haarlemmermeerse dorpen over drie jaar in gebruikNH Nieuws· Apr 2, 2026
- Grote datacenters bij Haarlemmermeer binnen drie jaar actiefMeerRadio· Apr 2, 2026
- Haarlemmermeer wil datacenterbeleid evalueren en ’repareren’. Voor tien meter hoge datacenter in aanbouw is dit te laat, onderzoek volgtHaarlems Dagblad· Feb 15, 2026
- Kritiek op gang van zaken rond datacenter AMS10MeerRadio· Feb 2, 2026
- Komst van groot datacenter zorgt voor kritiek op wethouderhcnieuws.nl· Feb 2, 2026
- ’Wat een blamage’: Gemeenteraad geeft wethouder uitbrander over werkwijze rond datacenter achter AalsmeerderbrugHaarlems Dagblad· Feb 1, 2026