Walterboro Data Center
Walterboro, Colleton County, SC
Source: Primary source
Walterboro Data Center is a proposed data center in Colleton County, SC, operated by Eagle Rock Partners. DataCentersExposed has documented 1,000 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Take action
Colleton, South Carolina
Walterboro Data Center in Walterboro, SC is contested. Petition: https://www.change.org/p/stop-the-data-center-from-coming-to-walterboro-sc | https://scdailygazette.com/2025/12/19/gigawatt-data-center-proposal-draws-opposition-from-sc-lowcountry-residents-politicians/ https://abcnews4.com/news/local/proposed-data-center-in-colleton-county-faces-environmental-pushback https://www.live5news.com/2025/12/15/9-new-data-centers-proposed-colleton-county/ Track what's being decided, when, and how to weigh in.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
1,000 MW of new demand — roughly a city of 800,000 homes.
Large new loads can raise transmission and capacity costs that land on every ratepayer. Residential power in SC is 16.4¢/kWh, up 7.7% year-over-year. (MW→homes is a rough ~800/MW planning figure.)
SourceDemand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkPurpose: AI. Location is within the ecologically important ACE Basin watershed. Application for rezoning pending. Part of parcel 209-00-00-001 Announced investment: $6.0B. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Operator chain
- Files asEagle Rock Partners
- This facilityWalterboro Data Center
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- South Carolina county passes first reading on data center moratoriumBluffton Today· May 10, 2026
- New data center developments in South Carolina are shrouded in secrecy, residents sayPost and Courier· Mar 15, 2026
- Data center joins gas pipeline, power plant as latest concern in SC's ACE BasinBluffton Today· Jan 12, 2026
- Suit filed to stop massive data center near nationally renowned nature preserve in SCThe State· Jan 9, 2026
- Who will pay to run the Colleton County data center?SC Daily Gazette· Dec 23, 2025
- Gigawatt data center proposal draws opposition from SC Lowcountry residents, politiciansSC Daily Gazette· Dec 19, 2025
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Black Street Early Childhood Center in Walterboro, is 4.5 mi from this site (309 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.