Vocus Sydney SYD02
New South Wales, Australia
Source: OpenStreetMap
Vocus Sydney SYD02 is an operating data center in New South Wales, Australia, operated by Vocus. DataCentersExposed has documented a 10,369 sq ft footprint at this site. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
Vocus
Operator
Vocus
Footprint
10,369 sq ft
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
New South Wales
Overview
source: linkVocus Sydney SYD02 is a mapped data center in Australia, operated by Vocus. Available records describe it as a Vocus data center with a reported footprint of 10,369 square feet. No ultimate parent above Vocus is disclosed in the facts on hand.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%
National grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)- Vocus plans 4,000km Brisbane-Darwin fibre route for AI, data centersET Datacenters· Sep 25, 2026
- Vocus plans 4,000km Brisbane-Darwin ducted fibre route as second ADIP projectcapacityglobal.com· Sep 24, 2026
- Vocus plans fibre link between Brisbane and DarwiniTnews· Sep 24, 2026
- Vocus plans 4,000km Brisbane-Darwin fibre routew.media· Sep 24, 2026
- ASC cable break causes connectivity disruption between Perth and SingaporeData Center Dynamics· Sep 7, 2026
- Equinix passes top Australian leadership to Jarrod NinkARNnet· Jul 28, 2026
See something wrong or missing on this page? Suggest a correction.