Mapped (unverified)colocation
Vautron Rechenzentrum
Regensburg, Bayern, Germany
Source: Primary source
Vautron Rechenzentrum is a mapped data center in Bayern, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Bayern
Overview
source: linkVautron Rechenzentrum AG — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- R-Kom plant Edge-Rechenzentrum in RegensburgDataCenter-Insider· Sep 24, 2026
- Warum die R-Kom im Regensburger Osten ein neues Rechenzentrum bautMittelbayerische Zeitung· Sep 21, 2026
- Boom in Zukunftsbranche: Technik für Rechenzentren kommt oft aus RegensburgMittelbayerische Zeitung· Sep 12, 2026
- Rechenzentrum in Wenzenbach; Lieblingsplatz Regenstauf: Mein Landkreis Regensburg vom 9. September 2026tvaktuell.com· Sep 9, 2026
- Rechenzentrum in Wenzenbach: Diese Risiken für Mensch und Natur befürchten FachleuteMittelbayerische Zeitung· Sep 8, 2026
- Stabile Energie für KI-RechenzentrenRegensburger Nachrichten· Aug 14, 2026
See something wrong or missing on this page? Suggest a correction.