Upper Magnolia Green West Tract A and Tract B
Moseley, Chesterfield County, VA
Source: Primary source
Upper Magnolia Green West Tract A and Tract B is a proposed data center in Chesterfield County, VA.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkThis project covers multiple parcels. The total acreage has been represented here. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Could Democrats gain votes from ‘lifelong Republicans’ upset over data centers?Fort Worth Star-Telegram· Jun 5, 2026
- 2,080 acres rezoned for data center development plan in Mason CountyMSN· May 29, 2026
- Google files for data center campus outside Richmond, VirginiaData Center Dynamics· May 14, 2026
- Liberty approves $229 million in tax breaks for huge new $1.4 billion data centerKansas City Star· Mar 24, 2026
- Lexington has no regulations for data centers. Could one come to Fayette County?Lexington Herald Leader· Mar 18, 2026
- With better technology, Kentucky can’t afford to chase data centers away | OpinionLexington Herald Leader· Mar 18, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Moseley Elementary in Moseley, is 3.1 mi from this site (894 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.