Upper Burrell Data Center/TECfusions Keystone Connect
New Kensington (Upper Burrell), Westmoreland County, PA
Source: Primary source
Upper Burrell Data Center/TECfusions Keystone Connect is an operating data center in Westmoreland County, PA, operated by TECfusions/TensorWave. DataCentersExposed has documented 12 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Take action
Westmoreland, Pennsylvania
Upper Burrell Data Center/TECfusions Keystone Connect in New Kensington (Upper Burrell), PA is contested. Group: https://www.protectpt.org/data-center Track what's being decided, when, and how to weigh in.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
12 MW of new demand — roughly a city of 10,000 homes.
Large new loads can raise transmission and capacity costs that land on every ratepayer. Residential power in PA is 21.5¢/kWh, up 13.2% year-over-year. (MW→homes is a rough ~800/MW planning figure.)
SourceDemand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkIn former Alcoa plant site, onsite gas generation and microgrid Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Operator chain
- Files asTECfusions/TensorWave
- This facilityUpper Burrell Data Center/TECfusions Keystone Connect
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELTTax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Charles A Huston Ms in Lower Burrell, is 3.6 mi from this site (416 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.