TPx Colocation Datacenter
2001 East Dyer Road · Santa Ana, Orange County, CA
Source: OpenStreetMap
TPx Colocation Datacenter is a mapped data center in Orange County, CA. DataCentersExposed has documented a 37,065 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Overview
source: linkTPx Colocation Datacenter is a mapped data center in Santa Ana, Orange County, California, tied to TPx Communications. Available records put its footprint at 37,065 square feet. The site draws power from Southern California Edison Co inside the CISO balancing authority. No ultimate parent is named in available records.
The grid behind this site, right now
source: CAISO · gridstatus- Solar46.8%
- Natural Gas28.7%
- Wind9.2%
- Hydro7.3%
- Nuclear5.3%
- Geothermal1.8%
- Biomass0.9%
Real-time generation mix for the CAISO grid this site draws from, as of Jul 15, 2026, 10:20 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Discussion halts on potential Solano County Fairgrounds data centerTimes Herald Online· Jul 14, 2026
- Solano County Fair Association will discuss proposed data centerTimes Herald Online· Jul 13, 2026
- Historic fairgrounds near San Francisco could become data center siteKALW· Jul 12, 2026
- New Mexico lawmakers plan data center moratorium after Project Jupiter concernsOrgan Mountain News· Jul 2, 2026
- Worries over water as a giant data center moves into the New Mexico desertNPR· Jun 14, 2026
- Data Center Load Growth Seen as Chance to Innovate -RTO Insider· Jun 10, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Heritage Elementary in Tustin, is 1.1 mi from this site (507 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.