Torquay Cable Landing Station
Victoria, Australia
Source: OpenStreetMap
Torquay Cable Landing Station is a mapped data center in Victoria, Australia, operated by SUBCO Pty Ltd. DataCentersExposed has documented a 4,125 sq ft footprint at this site. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkTorquay Cable Landing Station is a mapped data center site in Australia operated by SUBCO Pty Ltd. Available records describe it as a SUBCO Pty Ltd data center, with a reported footprint of 4,125 square feet. No ultimate parent above SUBCO is disclosed in available records.
Operator chain
- Ultimate parentSUBCO Pty Ltd
- Files asSUBCO Pty Ltd
- This facilityTorquay Cable Landing Station
The grid behind this site
source: Ember · EurostatNational grid context, not this facility's own metering. Full country picture: Australia data centers.