Tonaquint Data Center - Saint George
Saint George, UT
Source: Primary source
Tonaquint Data Center - Saint George is a mapped data center in UT.
Reporting by Eric Keller · Updated Jun 17, 2026
Overview
source: linkTonaquint Data Center, Inc. — colocation facility (9 networks present). Source: PeeringDB.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Explained: What you should know about data center regulations around St. LouisSTLPR· Aug 21, 2026
- Elected official’s text message sends St. Louis data center vote into disarraySt. Louis Magazine· Aug 13, 2026
- Friday, August 14, 2026The Addison Times· Aug 13, 2026
- City Council approves 12-month minimum pause on all data center applicationsNews-Press NOW· Jul 21, 2026
- Construction work is underway this summer at the site of a massive salt deposit in Bay St. GeorgeCBC· Jul 10, 2026
- Firmus defends jobs and energy use for data centres amid controversyPulse Tasmania· Jul 3, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Tonaquint Intermediate in Saint George, is 0.6 mi from this site (735 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.