Mapped (unverified)
TOKAIコミュニケーションズ data center, Okayama, Japan
Okayama, Japan
Source: OpenStreetMap
TOKAIコミュニケーションズ data center in Okayama, Japan is a mapped facility, operated by TOKAIコミュニケーションズ. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
TOKAIコミュニケーションズ
Operator
TOKAIコミュニケーションズ
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Okayama
Overview
source: linkThis is a mapped data center in Japan operated by TOKAIコミュニケーションズ. Available records identify the site only as a TOKAIコミュニケーションズ data center, with no disclosed parent company above the operator. Power capacity, footprint, and environmental records are not listed in the available record.
Operator chain
- Ultimate parentTOKAIコミュニケーションズ
- Files asTOKAIコミュニケーションズ
- This facilityTOKAIコミュニケーションズ data center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- TOKAIホールディングス---子会社TOKAI COMが孫会社アムズユニティーを吸収合併株探· Oct 1, 2026
- 東海地方にもデータセンター開発熱 製造業のフィジカルAIも後押しへ日本経済新聞· Jul 10, 2026
- JR東海、PFN、アクティアが東海道新幹線ネットワークを生かしたAIエッジデータセンター構想ZDNET Japan· Mar 30, 2026
- 関西への通信トラフィック集積で日本のインフラ強靭化へ 大阪中心部に都市型コネクティビティデータセンター「オプテージ曽根崎データセンター(OC1)」運用開始PR TIMES· Jan 30, 2026
- オプテージが「曽根崎データセンター(OC1)」運用開始 さらに3000億円規模の投資計画も (1/2)ASCII.jp· Jan 30, 2026
- ブロードバンドタワーへのサイバー攻撃、データセンターサービスに影響なし|セキュリティニュースのセキュリティ対策Lab合同会社ロケットボーイズ· Dec 22, 2025
See something wrong or missing on this page? Suggest a correction.