Mapped (unverified)colocation
TM ONE CBJ1, Cyberjaya
Cyberjaya, Selangor, Malaysia
Source: Primary source
TM ONE CBJ1, Cyberjaya is a mapped data center in Selangor, Malaysia. It runs on Malaysia's grid, which was 79% fossil-fuelled at 603 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
603 gCO₂/kWh
Clean electricity
21%
Region
Selangor
Overview
source: linkTelekom Malaysia Berhad (TM) — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
603 gCO₂/kWh
Clean electricity
21%
Fossil electricity
79%
National grid context, not this facility's own metering. Full country picture: Malaysia data centers.
In the news
source: Google News (local + English)- MRCB proposes RM419.05 mil Cyberjaya land sale for data centre developmentEdgeProp· Aug 7, 2026
- AirTrunk, Vantage make multibillion-dollar data centre moves in MalaysiaFree Malaysia Today· Jul 29, 2026
- Vantage said to mull US$2 bil data centre sale in Malaysia — BloombergThe Edge Malaysia· Jul 29, 2026
- Digital Realty deepens Malaysia investment with major Cyberjaya data hub expansionET CIO SEA· Jul 21, 2026
- Building green in the age of AI: Equinix’s Malaysia data center strategyCRN Asia· Jul 16, 2026
- Equinix says responsible expansion key to Malaysia data centre growthNST Online· Jul 15, 2026
See something wrong or missing on this page? Suggest a correction.