Mapped (unverified)
TIS data center, Osaka, Japan
Osaka, Japan
Source: OpenStreetMap
TIS data center in Osaka, Japan is a mapped facility, operated by TIS. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
TIS
Operator
TIS
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Osaka
Overview
source: linkTIS is a mapped data center in Japan, operated by TIS. Available records identify it only as a TIS data center, with no ultimate parent disclosed. Capacity, footprint, and environmental records are not listed in available records.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- 再編続く大手SIer系データセンターの現在地 AIによる電力コスト高騰にどう応えるか (2/2)ASCII.jp· Mar 13, 2026
- TIS、Quantum Meshと協業──液浸冷却技術で次世代AI基盤を共同開発Ledge.ai· Oct 27, 2025
- TIS、インテックを吸収合併 システムと通信網を一体提供日本経済新聞· Jul 30, 2025
- 明電舎、DRサイトのExadataサーバーをOCIに移行、維持費用を50%削減IT Leaders· Jul 14, 2025
- 事業成長のカギを握るNOKのクラウド移行プロジェクト~移行・運用を支援するTCSとTISのパートナーシップ~マイナビニュース· Jul 12, 2024
- TISの決済ソリューション基盤がOracle Cloud Infrastructureで稼働開始Oracle· Apr 16, 2024
See something wrong or missing on this page? Suggest a correction.