Mapped (unverified)
Teraco JB3 Isando Campus
Isando, Gauteng, South Africa
Source: OpenStreetMap
Teraco JB3 Isando Campus is a mapped data center in Gauteng, South Africa. DataCentersExposed has documented a 194,512 sq ft footprint at this site. It runs on South Africa's grid, which was 82% fossil-fuelled at 699 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~35-80 MW
Footprint
194,512 sq ft
Grid carbon
699 gCO₂/kWh
Clean electricity
18%
Region
Gauteng
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
699 gCO₂/kWh
Clean electricity
18%
Fossil electricity
82%
National grid context, not this facility's own metering. Full country picture: South Africa data centers.
In the news
source: Google News (local + English)- One data centre in South Africa will use more power than Kimberley or NelspruitMyBroadband· Aug 27, 2026
- JINX expands to ninth facility at Equinix JN1tech dot africa· Mar 10, 2026
- Teraco Isando: Building Africa’s Largest Data CenterConstruction Review· Dec 21, 2025
- The quiet boom in SA’s giant data centresnews24.com· Nov 10, 2025
- South Africa’s biggest data centres, rankedTechCentral· Oct 24, 2025
- Teraco data centre now largest in Africagadget.co.za· Aug 13, 2025
See something wrong or missing on this page? Suggest a correction.