Skip to content
DataCentersExposed
Mapped (unverified)

Teraco CT2

Western Cape, South Africa

Source: OpenStreetMap

Teraco CT2 is a mapped data center in Western Cape, South Africa. DataCentersExposed has documented a 155,109 sq ft footprint at this site. It runs on South Africa's grid, which was 82% fossil-fuelled at 699 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Operator
Est. capacity
~30-65 MW
Footprint
155,109 sq ft
Grid carbon
699 gCO₂/kWh
Clean electricity
18%
Region
Western Cape
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.