Mapped (unverified)
Telstra Clayton Data Centre
Victoria, Australia
Source: OpenStreetMap
Telstra Clayton Data Centre is a mapped data center in Victoria, Australia, operated by Telstra. DataCentersExposed has documented a 46,568 sq ft footprint at this site. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
Telstra
Operator
Telstra
Est. capacity
~5-20 MW
Footprint
46,568 sq ft
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
Victoria
Overview
source: linkTelstra Clayton Data Centre is a mapped data center in Australia operated by Telstra. Available records put its footprint at 46,568 square feet. No ultimate parent above Telstra is listed in the facts on hand, and the site is logged simply as a Telstra data center.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%
National grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)- Top 10: Telcos Expanding the Data Centre IndustryData Centre Magazine· Aug 5, 2026
- Government, experts repeatedly warned of issue that caused Telstra outageABC News & Headlines – Australian Broadcasting Corporation· Jul 9, 2026
- Telstra pulls State of Origin ads after ‘Y2K-like’ link to chaosThe Australian· Jul 9, 2026
- Telstra Points To Data Centre Time Sync Fault After Nationwide Network OutageSMBtech· Jul 8, 2026
- Telstra solves 'software defect' after hundreds of failed Triple Zero callsABC News & Headlines – Australian Broadcasting Corporation· Jul 8, 2026
- Telstra faces big fines after mobile outage, CEO cuts holiday shortAFR· Jul 8, 2026
See something wrong or missing on this page? Suggest a correction.