Skip to content
DataCentersExposed
Mapped (unverified)colocation

Telia Telehouse MUS

Tallinn, Estonia

Source: Primary source

Telia Telehouse MUS is a mapped data center in Estonia, operated by Telia. It runs on Estonia's grid, which was 40% fossil-fuelled at 316 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 17, 2026

Real parent
Telia
Operator
Telia
Grid carbon
316 gCO₂/kWh
Clean electricity
60%
Region
Estonia
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Telia Company — colocation facility (7 networks present). Source: PeeringDB.

Operator chain

  • Ultimate parent
    Telia
  • Files as
    Telia
  • This facility
    Telia Telehouse MUS

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
316 gCO₂/kWh
Clean electricity
60%
Fossil electricity
40%

National grid context, not this facility's own metering. Full country picture: Estonia data centers.

See something wrong or missing on this page? Suggest a correction.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.