Mapped (unverified)colocation
Telia Telehouse Copenhagen
Copenhagen, Region Hovedstaden, Denmark
Source: Primary source
Telia Telehouse Copenhagen is a mapped data center in Region Hovedstaden, Denmark. It runs on Denmark's grid, which was 6% fossil-fuelled at 99 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
99 gCO₂/kWh
Clean electricity
94%
DC power price
27.7¢/kWh
Region
Region Hovedstaden
Overview
source: linkNorlys Digital — colocation facility (19 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
99 gCO₂/kWh
Clean electricity
94%
Fossil electricity
6%
Data-center power price
27.7¢/kWh
A large data center in Denmark pays 27.7¢/kWh for electricity — a household pays 37.63¢, 26% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Denmark data centers.
In the news
source: Google News (local + English)- CIP and Thylander break ground for new data center in Copenhagenw.media· Aug 18, 2026
- Thylander breaks ground on Danish data center in EsbjergBeBeez International· Aug 17, 2026
- CIP to build Danish data centerEnergyWatch· Aug 15, 2026
- Copenhagen Infrastructure Partners, Thylander Start Construction Of Energy-Integrated Data Centre In DenmarkTradingView· Aug 13, 2026
- CIP and Thylander start construction of energy-integrated data centre in Denmark backed by PensionDanmarkThe Manila Times· Aug 13, 2026
- Green energy giants see $155b data centre boom as win for net zeroSMH.com.au· Jul 9, 2026
See something wrong or missing on this page? Suggest a correction.