Mapped (unverified)
Telegraph Building
China
Source: Wikidata
Telegraph Building is a mapped data center in China. It runs on China's grid, which was 58% fossil-fuelled at 526 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
526 gCO₂/kWh
Clean electricity
42%
Region
China
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkNo description yet.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
526 gCO₂/kWh
Clean electricity
42%
Fossil electricity
58%
National grid context, not this facility's own metering. Full country picture: China data centers.
In the news
source: Google News (local + English)- NTT数据中心REIT公开售股集资近10亿元联合早报· Jul 7, 2025
- 日电信巨头NTT数据中心房产信托拟在我国上市 GIC投资1亿美元联合早报· Jun 27, 2025
- 日本电信巨头NTT数据中心以REIT在新加坡上市 GIC为基石投资者之一联合早报· Jun 27, 2025
- Labour approves data centre that threatens Heathrow third runwayThe Telegraph· Jun 10, 2026
- Mukesh Ambani's Reliance, Meta join hands for AI data centre in Gujarat's JamnagarTelegraph India· Jun 10, 2026
- Multibillion pound data centre project risks collapse over government delaysThe Telegraph· Jun 9, 2026