Mapped (unverified)colocation
Talejas iela 1
Riga, Latvia
Source: Primary source
Talejas iela 1 is a mapped data center in Latvia. It runs on Latvia's grid, which was 26% fossil-fuelled at 133 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
133 gCO₂/kWh
Clean electricity
74%
Region
Latvia
Overview
source: linkVAS "Latvijas Valsts radio un televizijas centrs" — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
133 gCO₂/kWh
Clean electricity
74%
Fossil electricity
26%
National grid context, not this facility's own metering. Full country picture: Latvia data centers.
In the news
source: Google News (local + English)- airBaltic cuts a third of its Airbus fleet and strengthens its base in Riga due to the warDemócrata· Aug 12, 2026
- AI data centre to help Latvian doctors make quicker diagnoses / ArticleLSM· Jul 9, 2026
- Latvia's Tet completes work on Riga data centerData Center Dynamics· Jun 2, 2026
- Delska opens 10 MW AI-focused data center in Latviaw.media· Apr 17, 2026
- Delska launches data center in Riga, LatviaData Center Dynamics· Apr 17, 2026
- Is Riga the Baltics' Answer to AI Data Centre Demand?Data Centre Magazine· Apr 16, 2026