T-Mobile Warszawa-Szlachecka is a mapped data center in województwo mazowieckie, Poland. DataCentersExposed has documented a 17,941 sq ft footprint at this site. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~5-10 MW
Footprint
17,941 sq ft
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo mazowieckie
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh
A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Poland data centers.
In the news
source: Google News (local + English)- Czy Polska ma szansę zostać centrum baz danych i czy to naprawdę szansa?edgp.gazetaprawna.pl· Apr 23, 2026
- Ogromne centrum danych powstaje pod Warszawą. To część inwestycji za 600 milionów euroWarszawa Nasze Miasto· Apr 14, 2026
- Data4 uruchamia drugie centrum danych pod WarszawąCRN Polska· Apr 9, 2026
- Nowe centrum danych pod Warszawą. 600 mln euro i 400 miejsc pracyUrbanity· Apr 9, 2026
- Data4 przyspiesza inwestycje w Polsce – drugie data center pod Warszawą już działaITwiz· Apr 9, 2026
- Data4 uruchamia drugie centrum danych pod Warszawą, inwestycje sięgną 600 mln euro do 2030BIZNES24· Apr 9, 2026