Switch Pyramid Data Center is a under construction data center in Kent County, MI, operated by Switch, Inc.. DataCentersExposed has documented 320 MW of reported power capacity and a 1,800,000 sq ft footprint at this site.

Reporting by · Updated Jun 18, 2026

Real parent
Operator
Switch, Inc.
Power
320 MW
Footprint
1,800,000 sq ft
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Expanding; adding third building Announced investment: $5.0B. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
0.6 mi
Unknown129934 · 138 kV
Transmission line
0.3 mi
138 kV line
Municipal water
No service area
self-supplied or unmapped

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Data-center discussions in Kent County

source: LocalView (CC0)

Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.

Kent County Board
Jun 23, 2016 · 10 data-center mentions
Kent County Committee
Oct 24, 2017 · 9 data-center mentions
Kent County Committee
Jul 6, 2016 · 7 data-center mentions

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Michigan reported $1.1M in Data Center / Colocation Sales and Use Tax Exemption (MCL 205.54ee / 205.94, pre-2025 program) for FY2023 (Michigan Department of Treasury, Office of Revenue and Tax Analysis (ORTA)). Program-wide, not attributable to this site.

source · All Michigan subsidies →

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Endeavor Elementary in Grand Rapids, is 0.6 mi from this site (544 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.

See something wrong or missing on this page? Suggest a correction.