Mapped (unverified)
Swiss Fort Knox
Bern/Berne, Switzerland
Source: Wikidata
Swiss Fort Knox is a mapped data center in Bern/Berne, Switzerland. It runs on Switzerland's grid, which was 2% fossil-fuelled at 39 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
39 gCO₂/kWh
Clean electricity
98%
Region
Bern/Berne
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkNo description yet.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
39 gCO₂/kWh
Clean electricity
98%
Fossil electricity
2%
National grid context, not this facility's own metering. Full country picture: Switzerland data centers.
In the news
source: Google News (local + English)- Die Nummernkonten unserer ZeitTages-Anzeiger· Aug 8, 2017
- Datenschutz: Der geheime Schweizer BunkerSZ.de· Jul 29, 2016
- Das Daten-Fort-Knox am RheinTages-Anzeiger· Apr 30, 2016
- Daten-Alpenfestung wechselt NamenComputerworld.ch· Jul 2, 2010
- Active mine in the Italian Alps becomes a €50 million underground data center, betting on servers alongside apples, wine, and cheese.CPG Click Petróleo e Gás· May 17, 2026
- Construction completed on underground data center in the Dolomites, ItalyData Center Dynamics· Apr 10, 2026