Permittedcolocation

CyrusOne Stafford Campus

Stafford County, VA

CyrusOne Stafford Campus is a permitted data center in Stafford County, VA, operated by CyrusOne LLC. DataCentersExposed has documented 250 MW of reported power capacity at this site.

Reporting by · Updated Jun 14, 2026

Campaign · Decision pending

Take action

Stafford, Virginia

0
supporters

A public decision is in play. This is exactly the moment that changes outcomes — show up and speak.

Your action kit

Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.

Power & your bill

250 MW of new demand — roughly a city of 200,000 homes.

Large new loads can raise transmission and capacity costs that land on every ratepayer. Residential power in VA is 17.4¢/kWh, up 13.7% year-over-year. (MW→homes is a rough ~800/MW planning figure.)

Source
Process

Demand a full, public review — not a rubber stamp.

Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.

Public comment (editable)

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Records / FOIA request

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Join the campaign

Add your name and we'll email you before every hearing, with what to say and where to show up.

Helps show local strength to officials.

Double opt-in — confirm by email. We'll only email you about this campaign's hearings and milestones. Unsubscribe any time. We never share or sell your address. See our privacy policy.

Neighbors taking a stand

Be the first to say why this matters. Public notes appear here to show officials the strength of local feeling.
Real parent
CyrusOne LLC
Operator
CyrusOne LLC
Power
250 MW
Utility
Virginia Electric & Power Co
Grid
PJM
Attribution & capacity confidence:mediumprovenance JSON

Overview

CyrusOne Stafford Campus is a permitted colocation data center in Stafford County, Virginia, operated by CyrusOne LLC. Proposed in 2024, the project carries a reported power capacity of 250 MW, drawing electricity from Virginia Electric & Power Co within the PJM grid. The campus remains in the permitting stage and is not yet operating.

Operator chain

  • Ultimate parent
    CyrusOne LLC
  • This facility
    CyrusOne Stafford Campus

Grid & water — why here

source: HIFLD · EPA
Nearest substation
2.9 mi
Garrisonville
Transmission line
2.1 mi
line
Municipal water
No service area
self-supplied or unmapped

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.

source · All Virginia subsidies →

Water use

Modeled estimate~4.7M gpd
Direct (onsite cooling)
~2.3M gpd
Indirect (its electricity)
~2.4M gpd

No measured record exists, so this is a low-confidence model from 250 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

What this site costs the grid

source: PJM RPM auction reports
Dominion (Virginia / NC) · 2027/28 auction
$333 /MW-day
Peaked at $444/MW-day in 2025/26 1.65× the rest of PJM

PJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →

This site's capacity-market cost
$30.4M/yr

250 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.

Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →

Who lives nearby

source: Census ACS 2023
Median household income
$170.4K
People of color
51%
Below poverty
1%
Tract population
4,317

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Colonial Forge High in Stafford, is 1.1 mi from this site (1,996 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.