Solstice Data Center
Allen Park, Wayne County, MI
Source: Primary source
Solstice Data Center is a blocked data center in Wayne County, MI, operated by Solstice. DataCentersExposed has documented 26 MW of reported power capacity and a 45,400 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Take action
Wayne, Michigan
Solstice Data Center in Allen Park, MI is contested. Petition: https://www.change.org/p/non-allen-park-mi-residents-help-keep-ai-data-centers-out-of-wayne-county-cities-listed | Group: https://tockify.com/miresistevents/detail/1285/1767913200000 Track what's being decided, when, and how to weigh in.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
26 MW of new demand — roughly a city of 21,000 homes.
Large new loads can raise transmission and capacity costs that land on every ratepayer. Residential power in MI is 21.4¢/kWh, up 7.3% year-over-year. (MW→homes is a rough ~800/MW planning figure.)
SourceDemand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkImported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Operator chain
- Files asSolstice
- This facilitySolstice Data Center
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Allen Park imposes data center moratoriumthenewsherald.com· Jun 15, 2026
- Allen Park planners reject proposed data center: ‘We’re gonna celebrate with one eye open’Planet Detroit· Jun 5, 2026
- Allen Park shoots down data center plansFOX 2 Detroit· Jun 5, 2026
- Data center site plan denied in Allen Park after voting was postponed three timesWXYZ 7 News Detroit· Jun 4, 2026
- Allen Park Planning Commission denies data centerthenewsherald.com· Jun 4, 2026
- Allen Park residents push for data center moratorium amid growing oppositionMLive.com· May 30, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Michigan reported $1.1M in Data Center / Colocation Sales and Use Tax Exemption (MCL 205.54ee / 205.94, pre-2025 program) for FY2023 (Michigan Department of Treasury, Office of Revenue and Tax Analysis (ORTA)). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Rogers Early Elementary School in Allen Park, is 0.3 mi from this site (462 students). 3 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.