Mapped (unverified)Network node
Softdados Aracaju POP
Aracaju, Sergipe, Brazil
Source: Primary source
Softdados Aracaju POP is a mapped data center in Sergipe, Brazil. It runs on Brazil's grid, which was 11% fossil-fuelled at 110 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 18, 2026
Real parent
—
Operator
—
Region
Sergipe
Overview
source: linkSoftdados Telecomunicações — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
110 gCO₂/kWh
Clean electricity
89%
Fossil electricity
11%
National grid context, not this facility's own metering. Full country picture: Brazil data centers.
In the news
source: Google News (local + English)- Axia aposta em data center em SergipeData Center Dynamics· Oct 30, 2025
- Do sertão à nuvem: Axia, a nova Eletrobras, aposta em data center em SergipeBNamericas· Oct 30, 2025
- Governo de Sergipe visita empresa nos EUA que construirá data center de R$ 6 bilhõesData Center Dynamics· May 9, 2025
- Sergipe avança em data center de US$ 1 bilhão durante missão nos EUAMovimento Econômico· May 8, 2025
- Aena implanta 10 data centers com Trusted DataBaguete· Apr 3, 2025
- Optimus investe US$ 1 bilhão em data center de alta tecnologia em SergipeMovimento Econômico· Mar 15, 2025
See something wrong or missing on this page? Suggest a correction.