Mapped (unverified)colocation
SOCO Datacenter
Dueren, Nordrhein-Westfalen, Germany
Source: Primary source
SOCO Datacenter is a mapped data center in Nordrhein-Westfalen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Nordrhein-Westfalen
Overview
source: linkSOCO Network Solutions GmbH — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Unterirdischer "Bunker" von NetAachen: Größte Investition in sicheres RechenzentrumAachener Zeitung· Mar 19, 2026
- Fehler im Hochspannungsnetz sorgte für Stromausfall in Aachen – auch Ampeln betroffenAachener Zeitung· Mar 10, 2026
- Stromausfall in Rechenzentrum: Regelbetrieb läuft wieder anWDR· Mar 4, 2026
- Störung bei der Regio IT behoben: Systeme laufen wiederAachener Zeitung· Mar 4, 2026
- Stromausfall bei der Regio IT: Die Systeme laufen wieder, wichtige Fragen sind offenAachener Zeitung· Mar 4, 2026
- Stromausfall legt Verwaltungen in NRW lahmSpiegel· Mar 3, 2026
See something wrong or missing on this page? Suggest a correction.