Skybox Hutto PowerCampus Data Center
Hutto, Williamson County, TX
Source: Primary source
Skybox Hutto PowerCampus Data Center is a under construction data center in Williamson County, TX.
Reporting by Eric Keller · Updated Jun 18, 2026
Take action
Williamson, Texas
Skybox Hutto PowerCampus Data Center in Hutto, TX is contested. Petition: https://www.change.org/p/say-no-to-the-skybox-data-center-and-substation-in-round-rock-tx Track what's being decided, when, and how to weigh in.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
Demand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkAnnounced investment: $0.13. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Texas bars data centers from raising utility costs for residentsPlanetizen· Jun 12, 2026
- Data Boom: Williamson County’s data center explosionAustin Free Press· Jun 4, 2026
- Massive AI Data Center under construction in Hutto, TexasFarm Action· Jun 3, 2026
- Texas data centers' demand for electricians is delaying housing construction by 2 monthsPlanetizen· May 1, 2026
- Catch up on 4 government updates in Pflugerville, Hutto areaCommunity Impact | News· May 1, 2026
- Amid local opposition, developer pulls bid to build data center in HuttoAustin American-Statesman· Apr 22, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Hutto El in Hutto, is 1.6 mi from this site (744 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.