Mapped (unverified)colocation
Sirius Technology DC - Prato
Prato, Toscana, Italy
Source: Primary source
Sirius Technology DC - Prato is a mapped data center in Toscana, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Toscana
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkSirius Technology SRL — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- Google promette di restituire più acqua di quanta ne consumano i suoi data center. Basterà a convincere i cittadini contrari?Hardware Upgrade· Jun 12, 2026
- Estracom, utile 2025 a 1,2 milioni di euro e investimenti per la fibrat24economia.it· Jun 1, 2026
- Estracom: l’Assemblea dei Soci approva il bilancio d’esercizio 2025Arezzo24· May 28, 2026
- Sonepar a Data Center Nation Milan 2026: perché la filiera elettrica entra nel cuore dei data centersbircialanotizia.it· May 22, 2026
- «Fermiamo il data center», nasce un nuovo comitatoLa Provincia Pavese· Apr 15, 2026
- Data center, il progetto sottoposto a valutazione strategica e ambientaleLa Provincia Pavese· Mar 14, 2026