Mapped (unverified)colocation
Servanet FRG5
Sundsvall, Västernorrlands län, Sweden
Source: Primary source
Servanet FRG5 is a mapped data center in Västernorrlands län, Sweden. It runs on Sweden's grid, which was 1% fossil-fuelled at 35 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
35 gCO₂/kWh
Clean electricity
99%
DC power price
7.47¢/kWh
Region
Västernorrlands län
Overview
source: linkSundsvall Energi Elnat AB — colocation facility (6 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
35 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
7.47¢/kWh
A large data center in Sweden pays 7.47¢/kWh for electricity — a household pays 23.51¢, 68% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Sweden data centers.
In the news
source: Google News (local + English)- ”Det skulle inte gå att bo kvar”Sundsvalls Tidning· Oct 11, 2026
- Alina och Wilma i Töva vill inte ha ett datacenterSVT Nyheter· Sep 30, 2026
- Verda tar in miljarder – planerar datacenter i SundsvallAffärsvärlden· Sep 22, 2026
- Storsatsning på datacenter i Torsboda – vad det betyder för SundsvallSundsvalls kommun· Sep 16, 2026
- Googles datacenter i Sundsvall tar elen och du kan få betalaDagens PS· Sep 9, 2026
- Det här kan vänta Torsboda om Google får klarteckenSundsvalls Tidning· Sep 2, 2026