Seeweb FRO2 is a mapped data center in Lazio, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Lazio
Overview
source: linkSeeweb Srl — colocation facility (4 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- Via Tallone, l'8 ottobre inizia la demolizione dell'ecomostroRaiNews· Oct 1, 2026
- Colleferro, cresce la mobilitazione contro il Data Center, avviata la raccolta firme per fermare l'iterFrosinoneToday· Sep 30, 2026
- Colleferro apre le porte al data center IAAvvenire· Sep 4, 2026
- A Colleferro il data center più grande del sud Italiail manifesto· Sep 3, 2026
- Data center a Colleferro: la sfida è guardare avantiCiociaria Oggi· Sep 2, 2026
- Data center, un treno da cogliere al voloCiociaria Oggi· Aug 22, 2026
See something wrong or missing on this page? Suggest a correction.